Project Detail

191 GE 139 H870101C 191-C-(221)T SAFORD-SPRINGERVILLE HIGHWAY (US 191) (BACK COUNTRY BYWAY - MP 151)
SouthEast DistrictItem # 17316
Engineering Specialist: Patton Samuel James
Pre-Qualification: YES
Bid Opening: 4/13/2018 11:00:00 AM

Pavement Rehabilitation

The proposed project is located in Graham and Greenlee County on US 191. The work begins at MP 139.00 and extends to MP 151.03. The work includes the milling of existing pavement and replacing it with asphaltic concrete end product, placement of an asphaltic concrete friction course, crack sealing, removing and replacing guardrail, placement and compaction of shoulder build up, applying pavement markings, traffic control, signing and other related work.
Plans Cost
Bid Set$131.00
Spec Set$59.00
Earth WorkN/A
Cross SectionN/A

Last Updated 2/23/2018 3:03 PM