Project Detail

060 MA 181 H880601C 060-C-(209)T SUPERSTITION FREEWAY (48TH ST)
Central DistrictItem # 5296
Engineering Specialist: Mahdi Ghalib
Pre-Qualification: YES
Bid Opening: 6/30/2017 11:00:00 AM

System Preservation (Restoration/Rehab/Resurface)

The proposed 48th Street Pump Station Rehabilitation work is located in Maricopa County within the City of Mesa on US 60 at Milepost 185.85. The work consists of removing and replacing three storm drain water pumps, three propane-fueled pump engines, three right-angle gear drives, one sump pump, new electrical controls, new gas detection system, new leveling elements, and other related work.
Plans Cost
Bid Set$14.00
Spec Set$5.00
Earth WorkN/A
Cross SectionN/A

Last Updated 6/22/2017 7:02 AM