Project Detail

060 PN 202 F007801C 060-C-(214)T PHOENIX-GLOBE HWY (US 60) (EB US 60 at Kings Ranch Road)
Central DistrictItem # 8356
Engineering Specialist: Fauzia Koly
Pre-Qualification: YES
Bid Opening: 2/8/2019 11:00:00 AM

Construct Left Turn Bay Extension

The proposed project is located in Pinal County, on US 60 at Kings Ranch Road, from milepost 202.51 to 202.69, near the community of Gold Canyon. The work consists of lengthening and widening the existing left-turn bay. The work includes removing existing AC pavement, excavation, placing AB, AC, fog coat, pavement marking, signing and other related work.
Plans Cost
Bid Set$1.00
Spec SetN/A
Earth WorkN/A
Cross SectionN/A

Last Updated 1/18/2019 4:24 AM