Project Detail

077 PN 102 H826701C 077-A-(208)T Tucson - Oracle Jct. - Globe Highway (SR 77) (POWER LINE TO SAN MANUEL ROAD)
SouthCent DistrictItem # 19214
Engineering Specialist: Jalal Kamal
Pre-Qualification: YES
Bid Opening: 11/8/2019 11:00:00 AM

CONSTRUCT SAFETY IMPROVEMENTS

The proposed project is located in Pinal County on State Route 77 between Milepost 102.50 and Milepost 109.14 Northeast of the Town of Oracle. The work consists of installing rumble strip, replacing guardrail end terminals, new guardrail, asphaltic concrete (miscellaneous paving), fog coat, and pavement marking and other related work.
Plans Cost
Bid Set$1.00
Spec SetN/A
Earth WorkN/A
Cross SectionN/A

Last Updated 10/13/2019 11:12 PM