Project Detail

008 MA 082 F009401C 008-A-(230)S YUMA - CASA GRANDE HIGHWAY (I-8) (East of Yuma - Maricopa County)
SouthWest DistrictItem # 7877
Engineering Specialist: Patwary Mohammed
Pre-Qualification: YES
Bid Opening: 11/1/2019 11:00:00 AM

System Preservation (Restoration/Rehab/Resurface)

The proposed work is located in Maricopa County on interstate 8, approximately 35 miles west of the Town of Gila Bend between milepost 82.00 and 96.00 The work consists of removing the existing asphaltic concrete (AC) by milling and replacing it with new AC and Asphalt-Rubber Asphaltic Concrete Friction Course. Additional work includes upgrading existing guardrail system; replacing pavement markings, and other miscellaneous work.
Plans Cost
Bid Set$1.00
Spec SetN/A
Earth WorkN/A
Cross SectionN/A

Last Updated 10/13/2019 10:31 PM