As-Read Bid Results
008 MA 083 F025901C 008-A-(236)T YUMA - CASA GRANDE HIGHWAY (I-8) (Sentinel Rest Area)
SouthWest DistrictItem # 100235
Engineering Specialist: Brandon Campbell
Pre-Qualification: YES
Bid Opening: 9/17/2021 11:00:00 AM
The proposed project is located in Maricopa County along Interstate 8 at Milepost 83. The work includes rehabilitating existing restroom buildings, rehabilitating water and wastewater systems, widening parking lots, ADA compliance, striping, and other related work items.
Bid Amount |
Contractor Name |
Contractor Address |
$6,948,826.00
|
DEPARTMENT |
PHOENIX, AZ |
$7,635,134.16
|
HAYDON BUILDING CORP |
PHOENIX, AZ |
$9,180,777.77
|
FANN CONTRACTING, INC |
PRESCOTT, AZ |