As-Read Bid Results
040 CN 190 F010701C 040-C-(224)T ASH FORK - FLAGSTAFF HWY (I-40) (A-1 MOUNTAIN TI UP)
NorthCent DistrictItem # 8804
Engineering Specialist: Brandon Campbell
Pre-Qualification: YES
Bid Opening: 9/17/2021 11:00:00 AM
The proposed project is located in Coconino County on I-40, 2 miles west of the City of Flagstaff at approximate milepost 190. The work consists of removing the existing bridge at A-1 Mountain and constructing a new bridge with two single span box beams on a Geosynthetic-Reinforced Soil-Integrated Bridge System; Additional work includes milling and replacing asphaltic concrete; replacing guardrail; constructing bridge barrier transitions; and other miscellaneous work.
Bid Amount |
Contractor Name |
Contractor Address |
$5,012,314.50
|
DEPARTMENT |
PHOENIX, AZ |
$4,903,602.59
|
FNF CONSTRUCTION, INC. |
TEMPE, AZ |
$4,966,841.95
|
WILLIAM CHARLES CONSTRUCTION COMPANY, LLC |
SCOTTSDALE, AZ |
$6,074,486.85
|
VASTCO, INC. |
CHINO VALLEY, AZ |
$6,298,777.00
|
SUNDT CONSTRUCTION, INC. |
TEMPE, AZ |
$6,420,420.00
|
FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING |
Tempe, AZ |