As-Read Bid Results

040 MO 0 F046401C 040-A-NFA TOPOCK - KINGMAN HIGHWAY (I 40) (CA Border - MP 2.54)
NorthWest DistrictItem # 102779
Engineering Specialist: Yusuf Kadem
Pre-Qualification: YES
Bid Opening: 12/2/2022 11:00:00 AM

PAVEMENT PRESERVATION

The proposed work is located in Mohave County on Interstate 40 between milepost 0.12 and 2.40 near Topock. The proposed work consists of Type III micro-surfacing of the existing interstate travel lanes and ramp entrances. The Two Pass micro-surfacing work includes a rut-filling scratch course and a surface course. The project also includes spot location pavement prep work by milling and replacing with asphaltic concrete then finished with a Type III, micro-surfacing surface course. Additional work includes replacing pavement markings and other related work.
Bid Amount Contractor Name Contractor Address
$1,220,377.25 DEPARTMENT PHOENIX, AZ
$956,000.00 VSS INTERNATIONAL, INC. West Sacramento, CA
$1,020,305.36 SOUTHWEST SLURRY SEAL, LLC PHOENIX, AZ
$1,055,151.28 CACTUS TRANSPORT II, INC. TOLLESON, AZ
$1,106,435.75 INTERMOUNTAIN SLURRY SEAL, INC. Salt Lake City, UT
$1,189,990.00 SUNLAND ASPHALT & CONSTRUCTION LLC PHOENIX, AZ

Last Updated 4/18/2024 9:50 PM