The proposed work for project 010 PM 248 H7583 01C is located in Pima County, on 1-10 from milepost 248.03 to milepost 251.85, in the City of Tucson, Town of Marana, and unincorporated Pima County. The work consists of reconstructing 1-10 to provide four general purpose lanes in each direction. The work includes construction of bridges, Portland cement concrete pavement, asphaltic concrete pavement, drainage facilities, and mechanically stabilized earth walls. Additional work includes, pavement markings, signing, lighting, freeway management system, landscaping, aesthetics, and other related work.
The proposed work for project 0000 PM PPM T0327 01C is located in the City of Tucson and unincorporated Pima County along Sunset Road, starting at the Santa Cruz River Bridge just east of Silverbell Road, and extending east to River Road. The work consists of roadway and bridge improvements including pathway connection to the Chuck Huckelberry Loop for approximately 1.06 miles of roadway construction. The work also includes construction of bridges, Portland cement concrete pavement, asphaltic concrete pavement, drainage facilities, and mechanically stabilized earth walls. Additional work includes pavement markings, signing, lighting, freeway management system, landscaping, aesthetics, and other related work.