As-Read Bid Results

019 PM 001 F051401C 019-A-(244)T NOGALES -TUCSON HWY (I-19) (Port of Entry - I-10)
SouthCent DistrictItem # 103293
Engineering Specialist: Mowery-Racz Thomas
Pre-Qualification: YES
Bid Opening: 10/4/2024 11:00:00 AM

System Enhancement (Traffic Mgmt and Engineering)

The proposed project is located on I-19 from the Port of Entry (MP 2.48) to I-10 (MP 57.19) within Santa Cruz County and Pima County. The proposed work consists of the installation of closed-circuit television cameras, thermal cameras for wrong-way detection, fiber optic cable, dynamic message signs, butterfly sign structures, fiber optic connectivity to existing traffic signals, and other related work.
Bid Amount Contractor Name Contractor Address
$4,579,661.25 DEPARTMENT PHOENIX, AZ
$6,194,028.98 WILLIAM CHARLES CONSTRUCTION COMPANY, LLC SCOTTSDALE, AZ
$9,464,958.00 CONTRACTORS WEST, INC. MESA, AZ

Last Updated 7/15/2025 9:32 PM