As-Read Bid Results

060 MA 110 F088301C 060-A-NFA WICKENBURG - PHOENIX HIGHWAY (US 60) (MORRISTOWN TO WICKENBURG NB PA)
NorthWest DistrictItem # 104055
Engineering Specialist: Rene Teran
Pre-Qualification: YES
Bid Opening: 1/30/2026 11:00:00 AM

System Preservation (Restoration/Rehab/Resurface)

The proposed project is located within Maricopa County and is on US Route 60 (US 60). This planned project is located within the Arizona Dept. of Transportation Northwest District and Central District and will repair existing pavement distresses between Wickenburg, AZ (MP 110.59) and Morristown AZ (MP 121.50). Proposed work consists of milling and replacing AC pavement, installing pavement markings and other related work.
Bid Amount Contractor Name Contractor Address
$2,508,766.00 DEPARTMENT PHOENIX, AZ
$1,456,757.00 SUNLAND ASPHALT & CONSTRUCTION LLC PHOENIX, AZ
$1,623,605.20 PAVECO, INC. SUN CITY, AZ
$1,759,931.65 CACTUS TRANSPORT II, LLC. TOLLESON, AZ
$1,770,622.80 FNF CONSTRUCTION, INC. TEMPE, AZ
$2,193,186.00 EARTH RESOURCES CORPORATION DEWEY, AZ

Last Updated 4/3/2026 8:54 PM