As-Read Bid Results

079 PN 105 F079101C 079-A-(215)T ORACLE JCT - FLORENCE HWY (Bunyan Wash to MP 110)
SouthCent DistrictItem # 104976
Engineering Specialist: Mike Wechselberger
Pre-Qualification: YES
Bid Opening: 1/30/2026 11:00:00 AM

System Preservation (Restoration/Rehab/Resurface)

The proposed work is located in Pinal County on SR79 between mileposts 105.00 and 110.00 between Bunyan Wash and MP 110.00. The proposed work consists of milling and placing a hot applied chip seal coat, followed by applying micro-surfacing. The project also includes spot repair work by milling and replacing with asphaltic concrete. Additional work includes replacing pavement markings and other miscellaneous work.
Bid Amount Contractor Name Contractor Address
$1,920,680.25 DEPARTMENT PHOENIX, AZ
$1,494,017.74 CACTUS TRANSPORT II, LLC. TOLLESON, AZ
$1,738,325.00 VSS INTERNATIONAL, INC. West Sacramento, CA

Last Updated 4/3/2026 8:54 PM