Project Planholders List

040 CN 211 F010801C 040-D-(237)T FLAGSTAFF-HOLBROOK HWY (WINONA TI UNDERPASS)
NorthCent DistrictItem # 8808
Engineering Specialist: Do David
Pre-Qualification: YES
Bid Opening: 2/7/2020 11:00:00 AM

BRIDGE DECK REPLACEMENT

The proposed project is located in Coconino County, on Interstate 40 at Milepost 211, approximately 13 miles east of the City of Flagstaff. The proposed work consists of replacing the bridge superstructure and full depth pavement section, striping, signing and other related work.
Proposal Pamphlet Contact Numbers Date
FNF CONSTRUCTION, INC.
115 S. 48TH STREET
TEMPE, AZ 85281-8504
Tel: (480) 784-2910
Fax: (480) 968-8607
12/26/2019
VASTCO, INC.
425 INDUSTRIAL DRIVE
CHINO VALLEY, AZ 86323
Tel: (928) 636-3880
Fax: (928) 636-3882
12/30/2019
J. BANICKI CONSTRUCTION, INC.
4720 E. Cotton Gin Loop, Suite 240
Phoenix, AZ 85040
Tel: (480) 921-8016
Fax: (480) 921-9456
12/30/2019
PULICE CONSTRUCTION, INC.
8660 E. HARTFORD DRIVE, SUITE 305
SCOTTSDALE, AZ 85255
Tel: (602) 944-2241
Fax: (602) 906-3783
1/6/2020
NON Bid Sets Contact Numbers Date
STINGER BRIDGE & IRON
4248 N. Hwy 87
Coolidge, AZ 85128
Tel: (520) 723-5383
Fax: (520) 723-7084
12/26/2019
Arrow Indian Contractors, Inc.
449 S. 48th Street, Ste # 101
Tempe, AZ 85281
Tel: (480) 776-5821
Fax:
12/27/2019

Last Updated 1/21/2020 5:35 AM