Project Planholders List

070 GH 293 H888801C 070-A-(217)T Globe-Lordsburg Highway (US 70) (BYLAS TO PIMA)
SouthEast DistrictItem # 10180
Engineering Specialist: Layth Al Obaidi
Pre-Qualification: YES
Bid Opening: 3/27/2020 11:00:00 AM

PAVEMENT PRESERVATION

The proposed project is located in Graham County on US 70 between mileposts 293.4 and 330.2, approximately 10 miles northwest of the City of Safford. Part of the project is within the San Carlos reservations. The work consists of applying a chip seal coat, replacing pavement markings and other related work.
Proposal Pamphlet Contact Numbers Date
FNF CONSTRUCTION, INC.
115 S. 48TH STREET
TEMPE, AZ 85281-8504
Tel: (480) 784-2910
Fax: (480) 968-7580
2/12/2020
CACTUS TRANSPORT II, INC.
8211 WEST SHERMAN STREET
TOLLESON, AZ 85353
Tel: (623) 907-2800
Fax: (623) 907-2900
2/13/2020
EARTH RESOURCES CORPORATION
300 S. LATILLA LANE
DEWEY, AZ 86327
Tel: (928) 775-2795
Fax: (928) 268-3487
2/24/2020
VSS INTERNATIONAL, INC.
3785 Channel Drive
West Sacramento, CA 95691
Tel: (916) 373-1500
Fax: (916) 373-0183
3/3/2020
*** Addendum #1 3/19/2020 9:22 AM ***
NON Bid Sets Contact Numbers Date
SMITH & ANNALA ENGINEERING CO. (SAECO)
5861 S KYRENE RD SUITE 5
TEMPE, AZ 85283
Tel: (480) 659-4101
Fax: (480) 659-4101
3/26/2020
*** Addendum #1 3/19/2020 9:22 AM ***

Last Updated 4/23/2024 9:11 AM