Project Planholders List

0000 PN APJ T024201C APJ-0-(217)T CITY OF APACHE JUNCTION (Old West Hwy Idaho Rd to Goldf)
Central DistrictItem # 100840
Engineering Specialist: Yusuf Kadem
Pre-Qualification: YES
Bid Opening: 5/5/2023 11:00:00 AM

Pedestrian Facilities Improvements

The proposed work is located in the city of Apache Junction. The length of the project is 2.97 miles in total which includes work along Old West Highway, from Idaho Road on the west end to Goldfield Road on the east end of the project, and Winchester Road, from Broadway Avenue on the south end to Old West Highway on the north end. The work consists of constructing a new sidewalk along both sides of Old West Highway and on the west side of Winchester Road including sections that are attached with concrete curb and gutter and sections that are detached. The work includes several box culvert extensions, bridge railing, scuppers, pedestrian access ramps, guardrail modifications, seeding, signing and pavement markings, and other related work.
Proposal Pamphlet Contact Numbers Date
NON Bid Sets Contact Numbers Date
Hot Az Hell Welding
900 East Adair Drive
Chino Valley, AZ 86323
Tel: (928) 713-4749
Fax:
3/16/2023

Last Updated 3/21/2023 5:02 AM