Project Planholders List

086 PM 166 F040001C 086-A-(225)T KINNEY RD - I-19 (Ajo Way - I 19)
SouthCent DistrictItem # 102288
Engineering Specialist: Layth Al Obaidi
Pre-Qualification: YES
Bid Opening: 1/28/2022 11:00:00 AM

System Preservation (Engineering)

The proposed work is located in Pima County on State Route 86 between milepost 166.55 and 170.84 near South Tucson. The proposed work consists of removing the existing asphaltic concrete surface course by milling and replacing it with a bonded wearing course overlay. The project also includes spot repair work by milling and replacement with asphaltic concrete. Additional work includes replacing pavement markings and other miscellaneous work
Proposal Pamphlet Contact Numbers Date
CACTUS TRANSPORT, INC.
8211 WEST SHERMAN STREET
TOLLESON, AZ 85353
Tel: (623) 907-2800
Fax: (623) 907-2900
12/28/2021
GRANITE CONSTRUCTION COMPANY
4115 E ILLINOIS ST
TUCSON, AZ 85714
Tel: (520) 748-8000
Fax: (520) 748-1862
1/4/2022
FNF CONSTRUCTION, INC.
115 S. 48TH STREET
TEMPE, AZ 85281-8504
Tel: (480) 784-2910
Fax: (480) 968-7580
1/4/2022
SUNLAND ASPHALT & CONSTRUCTION LLC
1625 E. NORTHERN AVENUE
PHOENIX, AZ 85020
Tel: (602) 323-2800
Fax:
1/10/2022
*** Addendum #1 1/19/2022 12:07 PM ***
NON Bid Sets Contact Numbers Date
COUGHLIN COMPANY, INC.
809 E. COMMERCE DRIVE
ST GEORGE, UT 84790
Tel: (435) 634-1266
Fax: (435) 674-5119
1/4/2022
UNDER BRIDGE PLATFORM ACCESS
P.O. BOX 2837
ROHNERT PARK, CA 94927
Tel: (707) 528-0373
Fax:
1/14/2022
*** Addendum #1 1/19/2022 12:07 PM ***

Last Updated 1/28/2022 1:21 PM