Project Planholders List

087 PN 127 F055301C 087-A-(215)T PICACHO-COOLIDGE-CHANDLEY-MESA HIGHWAY (SR 87 and Kleck Road)
SouthCent DistrictItem # 101747
Engineering Specialist: Dehghani Babak
Pre-Qualification: YES
Bid Opening: 10/18/2024 11:00:00 AM

System Enhancement (Safety Improvements)

The proposed project is located in Pinal County on State Route 87 between mileposts 127.74 and 128.05, near Coolidge. The work consists of constructing left turn lanes at the SR 87 and Kleck Road intersection. The work also includes guardrail, pavement marking, signing and other related work.
Proposal Pamphlet Contact Numbers Date
AJP ELECTRIC, INC.
1920 W. CHERYL DRIVE
PHOENIX, AZ 85021
Tel: (602) 944-5477
Fax: (602) 944-5784
6/3/2024
PAVECO, INC.
P.O. BOX 1067
SUN CITY, AZ 85372
Tel: (602) 288-8273
Fax: (602) 237-4182
6/6/2024
NON Bid Sets Contact Numbers Date
ADS Pipe (Advanced Drainage Systems)
4640 Trueman Blvd.
Hilliard , OH 43026
Tel: (480) 993-5058
Fax:
5/18/2024
DE LA FUENTES, LLC LAND SURVEYING, (DBE)
2810 NORTH 28TH PLACE
PHOENIX, AZ 85008
Tel: (602) 820-5371
Fax:
5/22/2024
Sprocket Transport, Inc.
4649 W. Altadena Ave.
Glendale, AZ 85304
Tel: (602) 334-1517
Fax:
6/5/2024

Last Updated 6/17/2024 10:58 PM