Project Planholders List

090 CH 298 F062901C 090-A-NFA WHETSTONE T.I. - JUNCTION SR 80 HWY (SR 90) (Kartchner Cavern State Park to)
SouthCent DistrictItem # 103819
Engineering Specialist: Zarghami Ata
Pre-Qualification: YES
Bid Opening: 4/12/2024 11:00:00 AM

Pavement Preservation

The proposed project is located in Cochise County on State Route 90 between mileposts 298.09 and 304.40, near Benson. The proposed work consists of removing the existing asphaltic concrete surface course by milling and replacing it with a two-pass micro-surfacing application. The work also includes spot repair work by milling and replacing the existing asphaltic concrete surface, replacing pavement markings, and other related work.
Proposal Pamphlet Contact Numbers Date
NON Bid Sets Contact Numbers Date
Maxwell Products
650 S. Delong Street
Salt Lake City, UT 84104
Tel: (801) 972-2090
Fax: (801) 972-5536
2/12/2024

Last Updated 2/21/2024 1:36 AM