Project Planholders List

089 CN 423 F056801C 089-C-(208)T FLAGSTAFF - CAMERON HIGHWAY (US 89) (TOWNSEND - WINONA RD - SUNSET)
NorthCent DistrictItem # 103491
Engineering Specialist: Brandon Campbell
Pre-Qualification: YES
Bid Opening: 6/14/2024 11:00:00 AM

DRAINAGE AND EROSION IMPROVEMENTS

The proposed project is located in Coconino County on US 89 starting at MP 423.80 and extending north to MP 431.78. A portion of the project limits are within Coconino National Forest Limits. The work includes culvert construction, concrete lined channel construction, removing shotcrete lined channels, pavement replacement, and temporary paved crossover roads and other related work.
Proposal Pamphlet Contact Numbers Date
NON Bid Sets Contact Numbers Date
ADS Pipe (Advanced Drainage Systems)
4640 Trueman Blvd.
Hilliard , OH 43026
Tel: (480) 993-5058
Fax:
5/14/2024
B4 Enterprises, Inc.
P. O. Box 2619
Cedar City, UT 84721
Tel: (435) 656-9527
Fax: (435) 656-9528
5/16/2024
DE LA FUENTES, LLC LAND SURVEYING, (DBE)
2810 NORTH 28TH PLACE
PHOENIX, AZ 85008
Tel: (602) 820-5371
Fax:
5/22/2024

Last Updated 5/26/2024 1:51 PM