Project Planholders List

0000 CH DGS T058101C DGS-0-(205)T CITY OF DOUGLAS (Chino Rd Ext- Phase 2)
SouthEast DistrictItem # 100402
Engineering Specialist: Jannatul Joarder
Pre-Qualification: YES
Bid Opening: 2/6/2026 11:00:00 AM

Capacity Additions (Reconstruction)

The proposed project is located in Cochise County within the City of Douglas along the existing Chino Road alignment, beginning approximately 1200 feet north of 9th Street and ending at SR 80. The approximate length of the project is 0.9 miles. The work shall consist of constructing one 12-foot southbound lane and one 12-foot northbound lane and 8-foot shoulders. A northbound left turn lane will be constructed at SR80. The work also includes construction of guardrail, drainage improvements, utility adjustment, signal modifications at the intersection of New Chino Road, SR80 and US 191, SR 80 median removals, roadway signing, pavement marking, and other related works.
Proposal Pamphlet Contact Numbers Date
GRANITE CONSTRUCTION COMPANY
4115 E ILLINOIS ST
TUCSON, AZ 85714
Tel: (520) 748-8000
Fax: (520) 748-1862
11/21/2025
K E & G CONSTRUCTION, INC.
1601 Paseo San Luis
Sierra Vista, AZ 85635
Tel: (520) 458-9594
Fax:
12/12/2025
HAWK CONTRACTING LLC
1022 E. LOYOLA DRIVE
TEMPE, AZ 85282
Tel: (480) 247-8470
Fax: (480) 247-8470
12/12/2025
*** Addendum #2 12/16/2025 3:35 PM ***
NON Bid Sets Contact Numbers Date
ATL-CMT
2921 B 30TH AVE
PHOENIX, AZ 85017
Tel: (602) 241-1097
Fax: (602) 277-1306
12/5/2025
*** Addendum #2 12/16/2025 3:35 PM ***

Last Updated 12/17/2025 7:39 AM