The proposed project is located on US 93 Highway, starting at MP 193.13 and proceeding in the southeasterly direction ending at MP 198.35. The project straddles a county line, with about 30% in Maricopa County and 70% in Yavapai County. The proposed work consists of upgrading a 2 lane roadway to a new 4-lane divided facility with roundabouts. Project also includes, frontage roads, drainage systems, lighting, signing and striping, landscaping and erosion control, traffic control and other related work.