Project Detail

019 SC 021 H893501C 019-A-(232)T NOGALES - TUCSON HIGHWAY (I-19) (TUBAC - WEST ARIVACA RD)
SouthCent DistrictItem # 6707
Engineering Specialist: Vian Rashid
Pre-Qualification: YES
Bid Opening: 8/7/2020 11:00:00 AM

Pavement rehabilitation

The proposed work is located in Santa Cruz County and Pima County on Interstate 19 between Milepost 21.1 and Milepost 31.8, a distance of approximately 10.7 miles. The work consists of milling the existing pavement and replacing it with new asphaltic concrete pavement with Asphaltic Concrete Friction Course (ACFC), and replacing a section of the existing asphalt pavement with Portland Cement Concrete Pavement. The work also includes installation of new cable barrier, replacing bridge barriers, replacing guardrails, signing, restriping and other related work.
Plans Cost
Bid Set$1.00
Spec SetN/A
Earth WorkN/A
Cross SectionN/A

Last Updated 7/2/2020 3:09 AM