Project Detail

471 CN 089 F033301C 089-D-(208)T CAMERON-BITTER SPRINGS HWY(US 89) (Wash, Moenkopi Wash & Five Mil)
NorthCent DistrictItem # 100221
Engineering Specialist: Jesmin Farhana
Pre-Qualification: YES
Bid Opening: 4/21/2023 11:00:00 AM

BRIDGE REHABILITATION

The proposed project is located in Coconino County on US 89, on three bridges from Milepost (MP) 471.73 to Milepost 481.89, west of Tuba City. The project is located within Navajo Nation lands. The work consists of bridge rehabilitation and reconstructing the approaches. The bridge rehabilitation will be performed on Wash Bridge, Moenkopi Wash Bridge and Five Mile Wash Bridge. The work includes mechanical milling of concrete deck and overlaying with Polyester Polymer Concrete (PPC), roadway excavation, placing aggregate base, asphaltic concrete and asphaltic concrete friction course. The work also includes repairing deck soffit and substructure cracks and spalls, removing and installing guard rail, drainage work, and other related work.
Plans Cost
Bid Set$1.00
Spec SetN/A
Earth WorkN/A
Cross SectionN/A

Last Updated 3/21/2023 3:30 AM