Project Detail
089 CN 423 F056801C 089-C-(208)T FLAGSTAFF - CAMERON HIGHWAY (US 89) (TOWNSEND - WINONA RD - SUNSET)
NorthCent DistrictItem # 103491
Engineering Specialist: Brandon Campbell
Pre-Qualification: YES
Bid Opening: 8/9/2024 11:00:00 AM
DRAINAGE AND EROSION IMPROVEMENTS
The proposed project is located in Coconino County on US 89 starting at MP 423.80 and extending north to MP 431.78. A portion of the project limits are within Coconino National Forest Limits. The work includes culvert construction, concrete lined channel construction, removing shotcrete lined channels, pavement replacement, and temporary paved crossover roads and other related work.