    019 SC 001 F070901C 019-A-(245)T    NOGALES – TUCSON HIGHWAY (I-19) (Western Avenue TI OP)
 
    SouthCent DistrictItem # 100192
 
    Engineering Specialist: Mahdi Ghalib
    Pre-Qualification: YES
    Bid Opening: 11/7/2025 11:00:00 AM
 
    System Enhancement (Engineering)
 
    The proposed work is located in Santa Cruz County on I-19 at milepost 1.0. The proposed work consists of removing existing deck surfaces by mechanical milling and applying two-inch polyester polymer concrete (PPC) overlay. The project also includes milling and replacing with asphaltic concrete, replacing pavement markings, guardrail and other miscellaneous work.
 
    
        
            
                
                    | Plans | 
                    Cost | 
                
            
            
                | Bid Set | $1.00 | 
                | Spec Set | N/A | 
                | Earth Work | N/A | 
                | Cross Section | N/A |